The vending machine business model is becoming more and more popular and attracting many investors. To start this business, you need to learn and determine many factors such as the machine location, the product line, the machine installation form. This will reveal the vending machine installation process to help you have a better understanding when starting this model.
How long does it take to install a vending machine?
Survey the machine location
Before scheduling the installation of the vending machine, the vending machine company will have a representative come with you to the machine location to survey.
This survey will help the company determine if your business is eligible. That condition depends on whether that location has a large enough potential customer base because the success of the vending machine will depend on how often the machine sells.
The company will survey the number of customers present in the installation area daily, and the number of visitors must reach 40 people or more. They will also discuss and give you the most optimal machine placement solution.
Schedule the vending machine installation
After confirming your location is eligible for vending service operation, the machine supplier will conduct an availability check of their equipment.
If the machine model that you choose is available, they will install it within 1-2 weeks. But if it is not available in stock, you have to wait for the supplier to order it from the manufacturer, therefore, the installation will take a few weeks. When the vending machine arrives at the warehouse, the supplier will contact you to schedule the machine installation.
Completing the machine installation
Vending machines will be installed as scheduled. However, the machine when installed was just an empty machine, but the supplier will make sure to fully load your device for it to start working and set up the utility features in just 1 day.
Notes when installing vending machines
Invest more in preparation
The vending machine installation is quite quick after signing the contract. However, preparation is often more important and takes more of your time. Therefore, you need to invest in the preparation from the machine location, the product line, the source of goods to the vending machine vendor.
Choosing a potential location or a reputable supplier will make your installation faster and more convenient.
Loading schedule for vending machine
After installing the vending machine and starting to operate, you will need to schedule the machine inspection and restocking every few weeks to make sure it always has enough product to serve customers.
In addition, you can hire a full machine care service from the supplier. This service will help your machine always operate smoothly, goods are fully loaded, any damage is solved quickly and thoroughly by technical staff.
Choosing a reputable vending machine installation vendor
A reputable vending machine supplier will have a professional, quick installation process and offer optimal solutions for you.
If you are looking for a vendor to install vending machines, you can immediately contact Dropfoods - the leading professional and reputable vending machines supplier in Vietnam. Dropfoods promises to bring you the best service and preferential.
To register to install vending machines with Dropfoods, you just need to follow these steps:
Step 1: Register information online at Dropfoods.
Step 2: Schedule a meeting to discuss your needs and provide the necessary solutions for you.
Step 3: Survey the machine location.
Step 4: Install the machine.
Address: Unit 401 PVFCCo Tower, 43 Mac Dinh Chi Street, Da Kao Ward, District 1, HCMC. (Monday - Friday: 8:30 am - 5:30 pm)
Phone: (84) 28 6290 6066
Email: contact@dropfoods.com
Facebook: https://www.facebook.com/dropfoods